top of page

MD Drywall Systems, LLC
Site Under Construction
Chase Bank in Melissa, TX
Mission Construction
May 2025 throughNovember 2025
This project included several key construction elements:
- Metal framing for the exterior walls and parapets
- An exterior Zip Board system with 2-inch foam insulation
- Metal framing for the interior walls and ceilings
- Drywall installation for both walls and ceilings
- Building insulation
- Door installation
- Installation of restroom accessories
The ceilings were constructed using a 9/16-inch Identitee System, featuring USG Mars High NRC ceiling tiles in the following sizes: 4" x 48", 48" x 48", and 24" x 24".

bottom of page